😪

  • insufferableninja@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    4
    ·
    12 days ago

    As I understand it, the guy did the best he could under the restrictions imposed on him by Boeing and Lockmart (no R&D budget, expensive fully disposable new rocket, etc)

    • burble@lemmy.dbzer0.com
      link
      fedilink
      arrow-up
      1
      ·
      11 days ago

      It’s tough with how much they were hamstrung, but without the Amazon contract, ULA would seriously be circling the drain and this would be a very different retrospective.

      The Vulcan ramp up seems very open to criticism, from the engine choice to SRB issues and the Atlas V shared infrastructure bottleneck.