It’s tough with how much they were hamstrung, but without the Amazon contract, ULA would seriously be circling the drain and this would be a very different retrospective.
The Vulcan ramp up seems very open to criticism, from the engine choice to SRB issues and the Atlas V shared infrastructure bottleneck.
It’s tough with how much they were hamstrung, but without the Amazon contract, ULA would seriously be circling the drain and this would be a very different retrospective.
The Vulcan ramp up seems very open to criticism, from the engine choice to SRB issues and the Atlas V shared infrastructure bottleneck.