😪

  • burble@lemmy.dbzer0.com
    link
    fedilink
    arrow-up
    1
    ·
    16 days ago

    It’s tough with how much they were hamstrung, but without the Amazon contract, ULA would seriously be circling the drain and this would be a very different retrospective.

    The Vulcan ramp up seems very open to criticism, from the engine choice to SRB issues and the Atlas V shared infrastructure bottleneck.