• thatKamGuy@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      9
      ·
      8 hours ago

      Now here’s an idea - we boil the water to turn turbines, and then have the steam collect and pool in an upper chamber before running through another turbine into the first boiling chamber below?

      • Deconceptualist@leminal.space
        link
        fedilink
        English
        arrow-up
        0
        ·
        6 hours ago

        I’m talking about pumped hydro power. It’s all the excitement of using water to turn turbines(as it’s released to gravity), but none of the boiling.

        • thatKamGuy@sh.itjust.works
          link
          fedilink
          English
          arrow-up
          0
          ·
          6 hours ago

          Oh, I understood - your comment g actually triggered a curiosity in me as to why we don’t combine the two methods (boiling and falling) to “double-dip” on electricity production.

          I’m sure there are plenty of practical reasons why not, but I genuinely don’t know.

          • Deconceptualist@leminal.space
            link
            fedilink
            English
            arrow-up
            1
            ·
            4 hours ago

            Well if you remember from school, energy is defined as the capacity to do work. And if the rising steam does the work of turning a turbine, it’ll have a lot less kinetic energy left afterwards and won’t rise nearly as far.