‘GenAI for Nuclear Licensing’
https://www.youtube.com/watch?v=PW9lusiwMz8&list=UU9rJrMVgcXTfa8xuMnbhAEA - video
https://pivottoai.libsyn.com/20251118-vibe-nuclear-lets-use-ai-shortcuts-on-reactor-safety - podcast
time: 6 min 24 sec
‘GenAI for Nuclear Licensing’
https://www.youtube.com/watch?v=PW9lusiwMz8&list=UU9rJrMVgcXTfa8xuMnbhAEA - video
https://pivottoai.libsyn.com/20251118-vibe-nuclear-lets-use-ai-shortcuts-on-reactor-safety - podcast
time: 6 min 24 sec
Hell yeah.
Nuclear energy isnt a technical problem, it’s a human problem. Specifically, the real expense in US nuclear construction is that there are only a handful of contractors who have the tribal knowledge to actually do nuclear construction e.g. pour concrete, install old-fashioned non-networked electrcal control systems, big switchgear, pipefitting, startup V&V, an so on.
They’ll all gladly monkeywrench, slow walk, and re-work every step because they know there’s no real competition for fleet-wide contracts, and no one from the CEOs to the craft on the ground want the job to end, so you get it decades late or not at all.
One more piece of evidence that prompt fondlers are not serious people.
Source: am person of nuclear
Yeah, even before the techbros showed up, there was this industry push to try to convince people that regulation was the problem. If we loosened the bolts just 10%, everything would work out, they think. Attacking the “linear no threshold model” seems to be the latest strategy.
It’s almost like there’s a reflexive need to blame government regulation on all the problems.