Floors. Putting a cove flash vinyl floor* into some fuck-ass soiled linen room with 8 outside corners, 2 45deg corners and 9 inside corners is just a Tuesday. Have it prepped for me and I’ll be ready to glue by break time.
The latest fresh bottle of bullshit is a 270m^2 that must be within the tolerance of 1mm up or down from reference. What the holy fuck is this shit? I hate it and never want to work with these people again.
*this is fucking hilarious, it’s not difficult to cut under a desk and I think everyone can see it in the face of the “tractor dude” but hey if bossman likes to be dragged by his ankles, I’ll drag him by his ankles.
Floors. Putting a cove flash vinyl floor* into some fuck-ass soiled linen room with 8 outside corners, 2 45deg corners and 9 inside corners is just a Tuesday. Have it prepped for me and I’ll be ready to glue by break time.
The latest fresh bottle of bullshit is a 270m^2 that must be within the tolerance of 1mm up or down from reference. What the holy fuck is this shit? I hate it and never want to work with these people again.
*this is fucking hilarious, it’s not difficult to cut under a desk and I think everyone can see it in the face of the “tractor dude” but hey if bossman likes to be dragged by his ankles, I’ll drag him by his ankles.