Long hanging fruit for today is the final building of Frameworks, to make Heavy Modular Frames. Literally everything is already done for this, except I didn’t have Manufacturers, at the time.
So, removing the temp Sink and Uploaders I had here, and framing out the building, we get a layout for where the final machines will go.
Building out and detailing the building.
And with a final long shot, we’re done.
Nerd docs.
Next up, I’ve picked out a rough location for the next project, mainly due to proximity of resources.
For starters, I need to extend out the main tubeway to map out a new building.
This machine layout should get the job done.
Also needing to be built out is the segment of the main Tubeway that I built out a couple weeks ago, to attach the two Geothermal Generators to the grid.
Looking at your “long shot” view: I assume each of your towers covers building one item (like module frames)? Do you have the structures themselves as blue prints, or do you build them by hand?
You can have a look at the old posts from that build.
Day 32 Day 74 Day 75 Day 78 Day 79
Sort of. Modular Frames do indeed get their own building. In addition, there’s a Smeltery building, a Constructory building, and a building for the other two Assembler products: Advanced Iron Plate and Encased Industrial Beam. Also, of course, the building I just built, for Heavy Modular Frames.
In this case, I did blueprint most of the structural stuff. The machines and all were done by hand.