“I’m seeing a lot more of those ugly solar panels on roofs these days. So I wanted to show Australians what a nuclear-powered option looked like. You can hardly notice it at all"
Look i hate the man. But nuclear power is the best possible energy solution we have. Nuclear energy can fix all elecyricity related global warming issues we have in a reasonable acheivable world saving timeframe.
But here we are associating what could be earths only hope of stopping the climate fuckup with the molerat man.
New nuclear power is now significantly more expensive than renewables, and almost any other form of grid-scale electricity.
It’s also far, far, far too slow to build. If you started the consents process now, you might see it operational in 15 years.
Gigawatt-class units really don’t scale well in smaller power grids. It’s a pretty common rule in power engineering that you need enough spinning/fast reserves to cover the unexpected, instant loss of your largest generator or transmission line. That’s fine if you have a 100MW grid; not so great when there’s 10MW of load.
Small modular/meme reactors have thus far been rather disappointing.
Throw more solar, storage, and demand response at it with a side of synchronous condensers.
the largest nuclear plant (built in Japan in the 1980s) was commissioned 5 years after the start of construction. I can’t imagine safety improvements since the 1980s would triple the time alone.
South Korea’s new Hanul reactors look like they’ve taken about 10 years each. https://en.m.wikipedia.org/wiki/Hanul_Nuclear_Power_Plant
(The table in section “Reactors” might be interesting, as it shows the pre-2000 reactors taking only about 5 years to complete)
If u go look at the spurce document and not a report on the document i found a couple interesting things.
Risk profiles have not been considered due to renewables variation etc
The nuclear costs are all based on one reactor from a single startup and overlooked the multitude of other reactors around the world at significantly better prices
Renewables where assumed to go down in cost but we have seen that the cost of storage has actualy been rising recently
It’s gone from being a project started in 2004 to build a 1650MWe plant costing 4.2 billion euros (in 2020 euros), to an estimated completion date of 2024, at 13.2 billion euros.
And this is France, a country that is very familiar and well-versed with building nuclear reactors.
Without the source document, this may well be the example you use from your 2nd bullet point. But I wouldn’t have called this a startup.
Does this not only look at 2023 to 2024 would that not skew it towards options that have a low upfront cost? Nuclear is strongest in the longterm not over the period of 1 year.
It’s just too expensive and too slow. Renewables with the additional Transmission and storage needed to make it reliable is much much cheaper, and quicker to build. The new csiro gencost report thats coming out basically says they nuclear is just not economically viable.
Tell me you have absolutely no clue about the electricity market, project planing and the economy without telling me you have absolutely no idea about the electricity market, project planing and the economy.
Look i hate the man. But nuclear power is the best possible energy solution we have. Nuclear energy can fix all elecyricity related global warming issues we have in a reasonable acheivable world saving timeframe.
But here we are associating what could be earths only hope of stopping the climate fuckup with the molerat man.
New nuclear power is now significantly more expensive than renewables, and almost any other form of grid-scale electricity.
It’s also far, far, far too slow to build. If you started the consents process now, you might see it operational in 15 years.
Gigawatt-class units really don’t scale well in smaller power grids. It’s a pretty common rule in power engineering that you need enough spinning/fast reserves to cover the unexpected, instant loss of your largest generator or transmission line. That’s fine if you have a 100MW grid; not so great when there’s 10MW of load.
Small modular/meme reactors have thus far been rather disappointing.
Throw more solar, storage, and demand response at it with a side of synchronous condensers.
why is Australian construction this fucking slow?
the largest nuclear plant (built in Japan in the 1980s) was commissioned 5 years after the start of construction. I can’t imagine safety improvements since the 1980s would triple the time alone.
It’s not Australian construction, it would seem to to be a Western country issue, or one potentially affecting any nuclear construction.
See Flamanville 3 ( https://www.world-nuclear.org/information-library/country-profiles/countries-a-f/france.aspx Under “new nuclear capacity”). It was started in 2007, and was estimated to be completed in 2012, but it’s still not completed. It’s currently scheduled to begin operating in 2024.
Oma powerplant in Japan was started in 2010, and is currently scheduled to be completed in 2026. https://en.m.wikipedia.org/wiki/Ōma_Nuclear_Power_Plant
South Korea’s new Hanul reactors look like they’ve taken about 10 years each. https://en.m.wikipedia.org/wiki/Hanul_Nuclear_Power_Plant (The table in section “Reactors” might be interesting, as it shows the pre-2000 reactors taking only about 5 years to complete)
That is for construction of a single reactor, not the whole plant. It’s also construction time, and does not include consents and consultation.
And yes, things are now that slow.
Do those cost calculations account for energy storage as well?
Yep. The latest CSIRO/AEMO report published this week addresses exactly this, with various levels of renewables penetration modelled, including associated firming costs (additional transmission & storage) Here’s an overview (spoiler: renewables are still cheaper by far.) https://www.abc.net.au/news/2023-12-21/nuclear-energy-most-expensive-csiro-gencost-report-draft/103253678?utm_source=abc_news_app&utm_medium=content_shared&utm_campaign=abc_news_app&utm_content=link
If u go look at the spurce document and not a report on the document i found a couple interesting things.
Are you able to link the source document?
However, as an example of why nuclear is seen as risky, time-consuming and subject to massive cost blowout and time delays, see Flamanville 3 ( https://www.world-nuclear.org/information-library/country-profiles/countries-a-f/france.aspx Under “new nuclear capacity”)
It’s gone from being a project started in 2004 to build a 1650MWe plant costing 4.2 billion euros (in 2020 euros), to an estimated completion date of 2024, at 13.2 billion euros.
And this is France, a country that is very familiar and well-versed with building nuclear reactors.
Without the source document, this may well be the example you use from your 2nd bullet point. But I wouldn’t have called this a startup.
deleted by creator
deleted by creator
Does this not only look at 2023 to 2024 would that not skew it towards options that have a low upfront cost? Nuclear is strongest in the longterm not over the period of 1 year.
deleted by creator
It’s just too expensive and too slow. Renewables with the additional Transmission and storage needed to make it reliable is much much cheaper, and quicker to build. The new csiro gencost report thats coming out basically says they nuclear is just not economically viable.
Nuclear made sense a few decades ago. But now, renewables are better by every metric that matters.
You need a baseload source
Tell me you have absolutely no clue about the electricity market, project planing and the economy without telling me you have absolutely no idea about the electricity market, project planing and the economy.