yeah, even the green case for nuclear - which has been around for a long time - falters on wind and solar with battery just being hilariously cheaper. At this point the funding problem is interconnects.
@dgerard @frezik
The problem is alway interconnects.
(There aren’t that many of them, and they tend to be scaled for fossil-fuelled power stations, probably 1MW being the smallest unless there were CHP setups with a grid feed.)