Desire path for straight sidewalk

  • dreadbeef@lemmy.dbzer0.com
    link
    fedilink
    English
    arrow-up
    15
    ·
    edit-2
    4 days ago

    bet you $10 the pole was there first. The cost of working with the cable company and paying their approved expensive team to remove it and moving it vs just taking your existing city contracted cement team and doing a little squiggly

    money is always the motive

    • Nollij@sopuli.xyz
      link
      fedilink
      English
      arrow-up
      4
      ·
      4 days ago

      I’ll throw in another $10 that the sidewalk was somewhere else initially.

      I’m betting the road was narrower, and the sidewalk further to the left (in the photo). The pole was to the right of the sidewalk. These were all planned/built around the same time.

      Then the road was widened. The sidewalk had to be pushed (moved/rebuilt) further to the right. They could’ve put it far enough over to be completely on the other side of the pole, but that would have other implications - including running into the fire hydrant in the background.

    • Pika@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      2
      ·
      4 days ago

      man I’m so glad we don’t have to deal with that here. All poles are owned by the town here, if they wanna move a pole they give notice to the utility companies “hey this is being moved on X date, if you wanna keep services on it we recommend you be there” (coordination wise, we still have many regulations to follow)

    • Sergio@piefed.social
      link
      fedilink
      English
      arrow-up
      2
      ·
      4 days ago

      In some places it’ll be the phone company and the power company and the cable TV/internet companies as well. You’d have to coordinate with all 3. And there may be regulations about how close it has to be to the street to enable repairs – regulations put there for the safety of the workers, as well as to keep the lines away from tree branches that might take them down during a storm.